Work Package 5
Integration and prototype evaluation
WP5 is the consequence of the work performed on the WP4 and the validation of the prototype tools developed on the core WPs, namely WP2 and WP3. The purpose of WP5 is to conceive a set of procedures to stablish an accurate methodology for the integration of the subsystems, deployment of the tools at the relevant scenarios and easy validation of expected functionalities, through the defined KPI’s analysis and highlighted gains, based on the usage results. RUD project will contextualise an industrial case, but the developed tool will have the implicit robustness to be scalable to other applications, such as services, logistics, environmental applications or other scenarios in which the analysis of unstructured 2D and 3D files is needed.